Jands Production Services > Equipment

News Archive for November, 2009

Sunday, November 22nd, 2009

Pearl Jam 2009

Story & photos by Cat Strom. Originally published in Pro Audio Asia

Excessive temperatures and strict noise pollution controls faced Pearl Jam and their crew at their massive outdoor gig at Sydney’s Football Stadium in support of their latest release, Backspacer. This was also the tour that Australian rental-company and long-standing L-Acoustics Rental Network Agent, Jands Production Services (JPS) was using to debut its new K1/Kudo line array system.

JPS – along with several of the world’s leading rental companies – are collaborating with the L- Acoustics R&D team in advanced field proofing of the new system that is specifically designed for stadiums. As a result the company has taken delivery of one of the limited number of K1 systems in the pilot programme. “The new K1 isn’t intended as a replacement for V-Dosc,” explains Jim Straw, JPS general manager. “The combination of K1 and Kudo is aimed at providing a scaled solution for large venues with Kudo providing a flexible horizontal and greater vertical dispersion, while the K1 offers fixed horizontal dispersion with a maximum of 5° inter-element angles for larger venues.

Pearl Jam’s FOH engineer, Greg Nelson, first heard the K1 system at Coachella, admitting that he was ‘blown away’ with how much sub bass could be achieved out of the main flown system. “Ratsound, our sound provider in the US, had purchased the system and I got to preview it at last year”s Coachella festival. I was wildly impressed with the performance,” he says. “The box just sounded better than anything else I had ever heard – straight out flat, just turn it on and go.
(Read more… )

Tuesday, November 3rd, 2009

Manson, Minnelli and Gray 2009

Marilyn Manson Tour Oct 2009

Dates

October 5, 7, 10, 14, 17 2009

Marilyn Manson rocked through Australia for another full-on tour. The system was made up of a 32 box V-Dosc system along with 24 x SB218 subs and a Digidesign D-show out front.

The monitor system included D&B M2 wedges, L-Acoustics ARC side-fills and a PM5DRH console.

JAS crew

FOH system tech: Craig Gordon
Monitor system Tech: Mathew “Boz” Boaro
Audio system tech: Shaun Ayles

Liza Minnelli Tour Sept 2009

Dates

October 16-17, 21, 23, 25, 30 2009
November 2 2009

Liza Minnelli returned to Australia after a 20 year hiatuses. A nice quiet affair for all to be had! A pleasant change from Slayer and Manson that week!!
The system supplied was a V-Dosc system with a Digidesign Profile out front.
The monitor system comprised of a PM5D console and the Wayloud wedges for Liza.
We supplied 16 x Nexo PS8 wedges for the orchestra as personnel monitors

JAS Crew

FOH system tech: Josh DeJong
Monitor Operator: Alan Mourant

David Gray Tour Sept 2009

Dates

13 & 15 Oct 2009

David Gray flew through Australia for a quick promo tour.
D&B J line was requested and supplied for the Hammer Hall show.
We supplied a console and monitor package for the other shows.
Analogue was recalled for FOH with a Midas H3000 and lots of that stuff we love. The monitors ran from the PM5D with the M2 wedges everywhere else.

JAS Crew

FOH system tech: Tristan Johnson
Monitor system Tech: Conor Dunne